Design of Drinking Water Treatment Facility System in Central Philippine University

  • By Dahlia H. Pescos and Nelson V. Golez

ABSTRACT

 

This project study presents an innovative way of constructing a drinking water treatment facility system within Central Philippine University. With the growing demand for sale drinking water, the proponents designed a water treatment facility for the institution. The facility is composed of five major process tanks namely: coagulation, settling, chlorination, filtration and treated water tanks. The facility can operate 24 hours a day, seven days a week and can treat 1.2 liters of water per minute. The flow of water in the facility is by virtue of gravity. It has a total land area of 456 square feet or 42.4 square meters and is located near the University Gymnasium. The drinking water treatment facility is estimated to cost PHP 154,000.00.